The driveway is drying out nicely, with some assistance from hosing down to slow the curing operation.
The central courtyard is looking good now that the pink primer has disappeared; it just never did go with the green guttering!
The laundry floor is now tiled. No grout, but the tiles are in. Bob is off now until after New Year, by which time the tiles will be well and truly set.
Garry has almost finished sanding the big beam, while Robert is mucking about with his painting materials.
Richard is applying the sealer to bedroom 3. The large white area on the right is the wall just inside the door.
Before Paint | After Paint |
The above shows how nicely the eastern side of the house has improved after cleaning the bricks, and painting the eaves.
Building A Home
Pre-Christmas Clean Up
The Last Of The Concreters