I spent the day running errands of one kind or another. The
last was on the far side of the building site, so I called in (on the way back) to
see how things went today. As it was after 3PM, I did not
expect to find anybody on site. I did see my neighbour Merv,
and he mentioned that there had been a door or something
delivery after the regulars had left. This turned out to be
the flyscreens for the house. Not needed just yet, so they
will remain wrapped in their plastic sheet until the end of
construction, I would expect.
The photo at left is taken from outside the pantry, looking
towards the north west. What's of interest is that the sliding
doors are now in position! One of the chores for the Expo
Aluminium man yesterday was to shave a little off the side
frames on (some of) the sliding doors; they were just a tad too
long, and while they could probably have been put in, removing
the doors for later might have been a bit of a challenge.
|
|
Looking North
|
Looking South
|
The above two photos are looking up and down the hall, showing
the progress of the tiling operation. The south looking view
also shows the parquet floor in bedroom 2.
Parquet Floors
The master bedroom floor, with coverage extending almost all the
way to the walls. There is a bit of a gap (to be covered by the
skirting board) to allow for expansion etc.
As above, except for bedroom 2/office.
Bedroom 3, ditto.
And finally bedroom 4.