The garage walls are looking quite good - the cement render has dried, and the gyprock is now installed too.

The slightly moved ditch for the refrigerant lines in case heating and/or cooling is required. The compressor would be located against gyprock wall, about a metre and a half from the back wall. The position is largely dictated by limits of pipe lengths - overall 39m from in-ground manifold to any air cooling unit, likely located in the roof.

Gyprock

The family/dining room, from about the location of the refrigerator. There are about 6 in the gyprock crew, and they are moving ahead at a great rate of knots on this early stage. Chris (the builder) estimates they will be finished by Friday week.

Bedroom 4's wardrobe is mostly finished, but not the walls.

The 'robe in bedroom 3 is also completed, as are the walls.

The ensuite as seen from the master bedroom, which is mostly missing its gyprock. This was partially remedied by later in the day!

The computer room
and workshop
Hall on eastern wing,
from garage
The WC The ensuite shower

Chris adding wood in hall
for gyprock attchment

Vergola

The Vergola crew at work installing the Vergola. This is basically a louvred roof with a mechanism to open and close the louvres as needed/appropriate. I think there's also an automatic system to close it during rain.

These are the louvres to be installed in the frame above. They are positioned top to bottom in the above photo, i.e. going away from the camera.