End of Bricks and Insulation

Click on an image to see a larger version

Another day, another visit! Good timing, as I could have stayed a little longer and seen the last brick ceremony! The brickies were certainly ready for it. And so am I - another step closer to moving in. As it was, the brick layers were starting to clean up, and Phil was back, taking away the wasted bricks.

A close up of the nifty cutting and laying atop the eastern most pillar for the porch, seen from outside the kitchen.

And the outside view of the pillar on the western end of the porch. When the drains are completed, the pipe on the right hand side of the pillar will be connected to the drain in the guttering, and rain water will start to flow into the bladder!

Insulation

One half of the insulation installing team putting the wall insulation into the kitchen, as seen from outside the powder room.

The insulation under the vaulted/raked ceiling in the family/dining/kitchen area. The insulation is just resting in there, as the rafters are at the (consistenly) correct spacing to hold the batts in place.

Wall and some ceiling insulation in bedroom 4. Note that this ceiling insulation is strapped in place.

On the far left is the other half of the installation team - installing the ceiling batts. And under the eave on the right is the cold water feed line to the solar collector. This was within the space available when installed, but seems to have dropped down a bit, probably when the line was bent and connected to the collector.


/icons/up.gifBuilding A Home
/icons/right.gifDrains And Render
/icons/left.gifWet Brick Laying