It has not been my practice to visit the site every day. But after my visit yesterday, Chris told me that the mixer taps needed to be delivered by mid morning on Tuesday. OK, another visit is in order. At least I'll get rid of them from the back of my car!
The roof is growing - now onto the eastern wing. While not visible
here, the Colourbond is also being installed on the far side.
![]() |
![]() |
The combination reflective barrier/insulation placed under the
Colourbond roofing material. Note that is
not
the only insulation in the roof - there will also be regular
insulation above the ceiling, and that is the major insulator
for the inside of the house; this material is to provide some
control of the under roof temeperatures, thus helping the
other insulation.
Craig the electrician was on site today with a colleague - Steve,
seen here feeding wires into the en-suite, and doing his best
professional at work
pose for the camera.