GutteringTo Go

Click on an image to see a larger version

The western wing as seen from the lounge room door. The guttering is up, and the safety fence for the roofers is in place. This seems a bit of overkill for a single level house, especially as Ryan pointed out that the carpenters have been all over the roof without it!

Note the guttering is the same colour as the roof will be, i.e. pale eucalypt.

The eastern wing as seen out the front door. Again guttering and safety fence in position.

The roof structure over the porch is now complete, and ready for the roof to be installed, which starts Monday I believe.

Most of today's photos are of the plumbing - hot water, cold (potable) water, rain water and the heating water pipes. These are really for long term maintenance questions - hopefully never needing to looked at.


/icons/up.gifBuilding A Home
/icons/right.gifThe Roof Appears
/icons/left.gifBrick Work Complete (sort of)