Note the guttering is the same colour as the roof will be, i.e. pale eucalypt.
The roof structure over the porch is now complete, and ready for the roof to be installed, which starts Monday I believe.
Most of today's photos are of the plumbing - hot water, cold (potable) water, rain water and the heating water pipes. These are really for long term maintenance questions - hopefully never needing to looked at.
Building A Home
The Roof Appears
Brick Work Complete (sort of)