The brick layers were in on Saturday, and finished the job. At least as much as they can. The non-arrival of the windows above the doors at the north and south end of the family/dining room makes it impossible to finish off the brickwork above the door level at the north end of the kitchen, and around the western courtyard.
The front door is all bricked in, as is the wall on the north side of the lounge room. And the window sills have been built under most of the windows! And that's Garry up on the roof, adding battens for the roof which goes on later this week, making the house much closer to being waterproof.
The western wing seen from inside the garage; the man on the right (back to camera) is Craig the electrician.