The brick layers were in on Saturday, and finished the job.
At least as much as they can. The non-arrival of the windows
above the doors at the north and south end of the family/dining
room makes it impossible to finish off the brickwork above the
door level at the north end of the kitchen, and around the
western courtyard.
The front door is all bricked in, as is the wall on the north side
of the lounge room. And the window sills have been built under most of
the windows! And that's Garry up on the roof, adding battens
for the roof which goes on later this week, making the house
much closer to being waterproof.
The western wing seen from inside the garage; the man on the
right (back to camera) is Craig the electrician.