Even More Bricks

Click on an image to see a larger version

Over the last couple of days, the doors for the house had been selected, and the arrangement of the front door too. Although the design showed a double door, my preference was for a single door with sidelights. That decision was necessary so the door frame could be built and inserted into the frame. Then the brickies can finish off the walls around the front door. As is happening in this photo, which shows the sub-frame for the doors, and Dean laying bricks just outside.

A view of the outside of the front door.

The kitchen area as seen from the lounge room. Much progress in the last two days

A view of the kitchen area, from the north east, showing the brickwork around here. There are a few more windows needing delivery before all of this can be finished, as there is a brick wall above the door just to the left of the left most pillar, and this cannot be built until the window is in position.

And introducing a new feature - bluegum.com'sbrick layer of the month. And the winner is ... Dean. Well done Dean. A valuable prize pack is not on its way!


/icons/up.gifBuilding A Home
/icons/right.gifBrick Work Complete (sort of)
/icons/left.gifYet More Roof And Bricks