The brick layers were rapidly approaching the south door in the lounge room. Problem is, the frame for that door is sitting here in the family room. And it's too tall to move through the house. So it has to go out over the just poured (and not yet set) porch.
But a little ingenuity will solve the wet concrete issue - some planks across it, as has been used for the last number of weeks.
But the planks are also an excellent diving board for a swan dive into the concrete. While showing us his diving skills, Dean (lead brick layer) almost lost his balance. But a good recovery resulted in no concrete injuries.
The hole in the house frame for the door was larger than needed, as the exact position of the door frame depends upon the bricks. So some additional wood is required to make the door a neat fit. While Garry went off to fetch a power saw from his ute, a little competition developed as Dean, a brick layer, cut the piece of wood to size with a hand saw. Fortunately there was no demarcation dispute!
The finished job - both lounge room doors are in position. Though not visible here, the brickies were already starting to lay bricks into the eastern edge of the rear door.