It was time to order the floor tiles, and since the house is between home and the tile shop, I called in to see progress and take some more photos. There will be about 170 square metres of tiles, and as this amount is more than is carried locally, they will be imported, taking about 6 to 8 weeks. Which is fine, as they are not needed until after that.

This view is from the garage, looking south west towards the master bedroom. The roof structure is now appearing - the closest one is above the laundry and partly the lounge room. And over on the right is part of the roof for the bedrooms.

The southern and eastern parts of the house, as viewed "out of" the kitchen window in the eastern wall. Also visible from here is the not quite right roof of one of the neighbouring houses.

The ceiling and roof structures from outside the south east corner of the lounge room, looking roughly north west.

Looking west along the retaining wall, from outside bedroom 4. The roof trusses will be cut to the proper length once the structure is complete - this is the better/easier way to make sure they are all the correct length to keep the guttering straight.

Walking along the roof is easy - for some. I'm not one of them!

Ryan and Garry working on fine tuning a piece of timber for the roof.

The whole crew - working, even! Ryan and Garry on the roof while Chris does the cutting in what will be the dining room.