Coming up the driveway, and there's a wall appearing! In fact, it's nearing completion. This is the retaining wall for the driveway. It's needed as the garage floor is just a little below house floor level, and so quite a bit above ground level. The wall keeps the driveway out of the garden, and I suppose a bit of vice versa.
The two "dry wall" retaining walls along the east and west (left and right above) sides of the house. Note for North Americans: in this context, dry wall means not cemented together, not that there is drywall/sheetrock (aka gyprock here) involved. I had to think about that the first time Chris metioned the term!
Bedroom 4 has become the storage area for some tiles and the doors. Yes, the internal doors have arrived. Perhaps even the front door, though I'm not sure about that. And the pile in front are the (indoor) floor tiles and the wall tiles for the showers.
And this is the anchor tile - the rest of the house is set from here. Chris and Bob (the tiler) spent the morning sorting out positions around the rest of the house, to make sure there were no "awkward" joins - awkward as in, for instance, a tile join 10mm from a wall or cupboard.
A closer view. Note the tile is not yet glued down - that was about to happen as I left, as Bob was mixing away. Not very clearly visible is the position line - a yellow line drawn down the concrete, on the left side of the tile. It was hard to see but is visible here.
As I arrived, Ryan was finishing putting some of the waterproofing compound on the ensuite floor. This is the end result, with an undercoat and the first of two finish coats. Note that the shower enclosure is also treated.